Get our buying guides
One email a month with new buying guides written for Canadian homes. No daily promotions, unsubscribe any time.
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order
Free shipping across Canada, no minimum · 30-day returns with a prepaid label · WELCOME10 = 10% off your first order





Free shipping across Canada, no minimum. Orders packed within 1–2 business days.
Free shipping across Canada with no minimum order. See shipping estimates and return conditions. To request help or a return, contact Kelorix with your order number.
Free shipping across Canada with no minimum order. See shipping estimates and return conditions. To request help or a return, contact Kelorix with your order number.
Matugajp 24 AWG 24/5 is a 100-foot, five-conductor extension cable made from tinned, oxygen-free stranded copper with a durable flame-retardant PVC jacket for low-voltage and light-duty DC/AC applications.
This 100-foot, five-core cable in black delivers flexible, corrosion-resistant conductors for electronics, lighting, hobby projects, and automotive accessories. Built with 24 AWG (0.2 mm²) strands that are tin-plated for easier soldering and improved longevity, the cable supports voltages from small DC systems up to 300 V and continuous temperatures between -20°C and 80°C. The jacket is engineered for weather resistance, abrasion protection, and flame retardance (VW-1 and FT1 rated), making it suitable for indoor runs and many outdoor, low-voltage uses.
The cable’s 26 tinned strands per conductor lower resistance and improve current flow for LED strips, garden accent lighting, and small DC fixtures. Tinning reduces oxidation on solder joints and helps maintain consistent contact over time.
The PVC jacket resists sun, moisture, and many corrosive conditions while meeting flame-retardant standards, so it tolerates exposed installations and light outdoor exposure. It’s not a heavy-duty power cable but is well-suited for garden lights, speakers, and vehicle accessories that require flexible, weather-resistant wiring.
The conductors are 24 AWG (0.2 mm²) with a maximum recommended current around 2.3 A per conductor under typical conditions, and the cable insulates safely up to 300 V. Use appropriate fusing and consider voltage drop on longer runs; this cable is optimized for low-current signal and low-voltage power applications rather than mains-level distribution.
The stranded, tin-plated copper is solder-friendly and holds well in crimp connectors or terminal blocks, while the jacket cuts cleanly for neat installations. The five distinct colored cores (black, red, yellow, white, green) speed up identification and wiring in multi-conductor setups.
Who is this for? Installers, hobbyists, and tinkerers who need a reliable, flexible five-conductor cable for LED runs, low-voltage garden lighting, small motors, sensors, audio speakers, model electronics, and general-purpose DC wiring will find this product well-suited. It’s a practical choice when you want moderate current capacity, easy soldering, weather resistance, and clear conductor identification for tidy, lasting installations.
Q: Can I use this 24/5 cable for 12V LED strip runs?
A: Yes—it's suitable for 12V LED strips; account for voltage drop over long runs and keep currents near or below 2.3 A per conductor.
Q: Is the jacket rated for outdoor exposure?
A: Yes—the PVC jacket is UV and moisture resistant with flame-retardant ratings VW-1 and FT1 for light outdoor use.
Free shipping across Canada with no minimum order. See shipping estimates and return conditions. To request help or a return, contact Kelorix with your order number.
One email a month with new buying guides written for Canadian homes. No daily promotions, unsubscribe any time.
Thanks for subscribing!
This email has been registered!